Through Palestine with the 20th Machine Gun Squadron by Unknown
page 14 of 169 (08%)
page 14 of 169 (08%)
![]() | ![]() |
|
towards Goz-el-Naam. "B" and "C" Sub-sections were attached to the "S.R.Y."
and "S.N.H." but saw no "targets" to justify the opening of machine-gun fire. "A" Sub-section was in reserve. The following day (the 19th), the Brigade returned to Amr. The experience gained by the Machine Gun Squadron during these operations proved to be most valuable; the animals were fit, but certainly rather fagged; the transport was found to be too heavily loaded, and the pack-animals were also tired. Orders were now received that when operations started the Squadron would move out five Sub-sections strong. This would mean a severe test for "D" and "E" Sub-sections. "D" Sub-section under Lieut. Raynor, was well in hand, although only formed a few weeks previously, but the equipment for "E" (and "F") had only just been drawn! HIGH-SPEED WORK. On October 20th, Lieut. Price, M.C., Lieut. Millman and Sec.-Lieut. Kindell (all from the recent draft from Maresfield) arrived at the Camp. Lieut. Price at once took over the organization of "E"; Lieut. Millman was nominally posted to "F" and Sec.-Lieut. Kindell supernumerary, for the time being. It could hardly be said that the formation of "E" Sub-section had been "rushed"! The term is hardly suitable--"Cyclonic" would be nearer the mark! It literally had horses and equipment issued to it one day, and was fighting the next. At length, on October 25th, definite orders were received for the first phase of the projected operations against Beersheba to be undertaken, and, the next day, Sec.-Lieut. Kindell and three O.R.'s (Ptes. Carr, Ineson and Marshall), with representatives from other units of the Brigade, proceeded with the Staff Captain and Brigade Intelligence Officer, to Esani, in order to "take-over" the camping area and reconnoitre |
|