The New York Subway - Its Construction and Equipment by Anonymous
page 58 of 199 (29%)
page 58 of 199 (29%)
![]() | ![]() |
|
concrete. The concrete floor was the first part of the lining to be
put in place. Rails were laid on it for a traveler having moulds attached to its sides, against which the walls were built. A similar traveler followed with the centering for the arch roof, a length of about 50 feet being completed at one operation. [Illustration: FOUR COLUMN (TOWER) VIADUCT CONSTRUCTION] [Illustration: MANHATTAN VALLEY VIADUCT, LOOKING NORTH] [Illustration: ERECTION OF ARCH, MANHATTAN VALLEY VIADUCT] On the Park Avenue section from 34th Street to 41st Street two separate double-track tunnels were driven below a double-track electric railway tunnel, one on each side. The work was done from four shafts, one at each end of each tunnel. At first, top headings were employed at the north ends of both tunnels and at the south end of the west tunnel; at the south end of the east tunnel a bottom heading was used. Later, a bottom heading was also used at the south end of the west tunnel. The rock was very irregular and treacherous in character, and the strata inclined so as to make the danger of slips a serious one. The two headings of the west tunnel met in February and those of the east tunnel in March, 1902, and the widening of the tunnels to the full section was immediately begun. Despite the adoption of every precaution suggested by experience in such work, some disturbance of the surface above the east tunnel resulted, and several house fronts were damaged. The portion of the tunnel affected was bulkheaded at each end, packed with rubble and grouted with Portland cement mortar injected under pressure through pipes sunk from the street surface above. When the interior was firm, the tunnel was redriven, using much |
|