South with Scott by baron Edward Ratcliffe Garth Russell Evans Mountevans
page 57 of 287 (19%)
page 57 of 287 (19%)
![]() | ![]() |
|
haulage was done by motors and men, but a few runs were made with ponies.
We erected a big tent on the beach at Cape Evans and in this the hut-building party and those who were stowing stores and unloading sledges on the beach got their meals and sleep. We worked continuously until 10 p.m. with only the shortest of meal intervals, and then, tired but contented, we "flattened out" in our sleeping-bags, bunks, or hammocks. The following day the same routine was continued and nearly the whole of the provision cases came ashore and were stacked in neat little piles under Bowers's direction. This indefatigable little worker now devoted himself entirely to the western party stores. He knew every case and all about it. Each one weighed approximately 60 lb. We had purposely arranged that this should be so when ordering stores in London to save weight and space. The cases were made of Venesta 3-ply wood. Of course, the instruments and heavier scientific gear could not stow in these handy packages, but the sixty-pound-Venesta was adhered to whenever possible. The ponies were not worked till the afternoon of the 6th, and then only the best of them with light loads. Davis, the carpenter, had with him seaman Ford, Keohane, and Abbot. Their routine was a little different from ours: they worked at hut building from 7 a.m. till midnight usually, and their results were little short of marvellous. Odd people helped them when they could, and of these Pouting showed himself to be _facile princeps_ as carpenter. I never saw anything like the speed in which he set up tongued and grooved match boarding. Day, Nelson, and Lashly worked with the motor sledges; the newest motor frequently towed loads of 2500 lb. over the ice at a six mile an hour speed. The oldest hauled a ton and managed six double trips a day. Day, |
|